Outdoor SolarEdge commercial battery storage cabinet at Richard Lee Primary School, Coventry

The project

Berry Electrical Services (UK) Ltd delivered a commercial battery storage installation at Richard Lee Primary School in Coventry, bringing together 102.4 kWh of storage and the electrical infrastructure needed to connect the system to the school’s installation.

The project highlights how energy storage at a school involves much more than positioning a battery cabinet. The connection, distribution equipment, protection, cabling and containment all form part of the installation.

Our installation

The project photographs show an outdoor battery cabinet with SolarEdge equipment, together with internal distribution and control equipment and associated cable routes. The cabinet sits on a raised concrete base, with cabling routed through protective containment.

Inside the electrical plant area, the installation includes distribution and control equipment alongside the school’s main switchgear. The gallery documents both installation work in progress and equipment with its covers fitted.

  • 102.4 kWh commercial battery storage installation.
  • Outdoor cabinet and SolarEdge equipment.
  • Associated electrical distribution and control equipment.
  • Power cabling and containment linking the installation.
  • Integration with the site’s electrical infrastructure.

Why battery storage matters for schools

Schools have a distinctive electricity demand, with busy teaching hours and quieter evenings, weekends and holidays. A battery can help an organisation manage when stored electricity is used, with its operating strategy matched to the building’s demand and electricity tariff.

Where a compatible solar PV system is connected, storage can also retain surplus generation for use later. The benefit depends on the site’s generation, consumption and system settings.

A joined-up electrical approach

This Coventry project demonstrates Berry’s approach to commercial battery storage: bringing the energy equipment and supporting electrical works together as one installation. It provides a practical example for schools, academies and commercial organisations considering energy storage.